We assemble both Headlights and attach them to their Support bar with Stage 82!
Monthly Archives: April 2023
Stage 81
The Bonnet Reinforcement Structure is finished up during Stage 81!
Stage 80
We start on the Bonnet Reinforcement Structure as we complete Stage 80!
Stage 79
We attach both Doors to the Central Bodywork and connect their switches to the Circuit Board in Stage 79!
Stage 78
The entire Rear Frame assembly is connected to our Central Bodywork with Stage 78!
Stage 77
We connect up a bunch of our Miura’s wiring to the Circuit Board and install the Cockpit Interior into the Central Bodywork during Stage 77!
Stage 76
In Stage 76, we attach the Dashboard and Front Frame to the Central Bodywork and also install the Circuit Board!
Stage 75
Pack 10 starts off by building the Fuel Pump assemblies and attaching them to the Front Frame with Stage 75!