We assemble the Spare Wheel and install it into our Front Frame with Stage 74, finishing up Pack 9!
Monthly Archives: March 2023
Stage 73
Additional details are attached to the right side of our Front Frame as well as both Bonnet Hooks and Buffers in Stage 73!
Stage 72
Many small details are added to the left side of our Front Frame in Stage 72!
Stage 71
We attach the Radiator Hoses and install the Radiator Tie Rods with Stage 71!
Stage 70
We build the Radiator with its Cooling Fans in Stage 70!
Stage 69
The fuel filler Tank Tube as well as the Master Cylinders are added to our Miura during Stage 69!
Stage 68
In Stage 68, the Front Crossbar is assembled and installed into our Front Frame!
Stage 67
We start Pack 9 by installing the front Brake Discs and Brake Calipers as we complete Stage 67!