The Front Wheel Hubs are installed into the front suspension in Stage 66!
Monthly Archives: February 2023
Stage 65
In Stage 65, we assemble both Front Wheel Hubs and a Brake Disc!
Stage 64
Just like before, we attach the Front Right Upper Wishbone Arm in Stage 64!
Stage 63
We install the Front Left Upper Wishbone Arm as we complete Stage 63!
Stage 62
The matching Front Right Lower Wishbone Arm is attached with Stage 62!
Stage 61
We install the Front Left Lower Wishbone Arm and a Shock Absorber during Stage 61!
Stage 60
The Reinforcement Crossbar along with the Windshield Washer Reservoir is added with Stage 60!
Stage 59
In Stage 59, we assemble and install the Horns into our Miura!